|
The Buildings
home | the buildings | cell 3 (630) | further pictures...
Most of the cell’s path is traced by blue steel beams which follow the straight tunnel beneath the ground.
As we approach the elevated section of Weir Road, part of this path can be seen, linking
the main cell building (which gives access to the testing chamber) to the covered section
(which gives access to the end of the exhaust manifold).
|
Looking south over the elevated section of Weir Road towards the main part of Cell 3 (on the left) and the covered section (on the right). 24|03|07 © Simon Cornwell 2007
|
|