The Buildings
home | the buildings | cells 1 & 2 (561) | further pictures...
The blue painted thrust frame is still in-situ along with the engine mounting pipe. Extra wires and pipes hang off the side of the cell; these were used to connect water
and fuel to the engine under test. To the left can be seen one of the tiny windows which allowed the operators in the control room to view the whole assembly.
|
Interior of Cell 1 and detail of thrust frame looking south. 21|04|07 © Simon Cornwell 2007
|
|